Members,
There is a water leak under the concrete at the entrance road close to the Office.
I have been coordinating with the Water Company. Tomorrow, Thursday, they will begin the repairs. At this time, we do not believe that we will have to totally close down the entrance road. The water company believes they can work on the one half, while the other half is left open. PLEASE BE ESPECIALLY CAREFUL AND SLOW IN THAT AREA AS THOSE REPAIRS ARE UNDERWAY. Should we feel that their employees are in danger at anytime, we will be forced to close the entrance road and reroute traffic – something we really don’t want to do.
We will have to do some similar coordination when the concrete is repoured after the repair, will keep you informed.
Mary Beth Huffman
ILPOA Board of Directors
PS: BTW, the water is only 3-4” from being as low as possible from the valve at the spillway being opened. Anything else we get will be from evaporation – if there is no precipitation.