Lake, Dam & Spillway Update (11/16/20)


The following update was provided by Mary Beth Huffman, currently the Interim Chairman for Lake, Dam & Spillway. If you have any questions regarding this update please email the ILPOA Office at indianlake@ilpoa.org.


As the water is close to being down as low as possible, we are able to inspect some of the areas in the lake.  We will be working on the following items as weather, water  and time allows:

  • Excavation around Cove 9 Docks
  • Excavating a channel through Cove 9 to allow the water from Brush Creek to drain through the lake
  • Concrete ramps at Cove 1, 5 and 9
  • Removal/burning of tree in Cove 9
  • Fixes along the concrete wall and bridge at the island
  • Inspection (possible repair) of the spillway valve box
  • Inspection of the dam wall as Maintenance has completed the mowing

Mary Beth Huffman, Interim Chair Lake, Dam & Spillway